The club are pleased to be able to confirm that a new aeration system is being installed on both the Donut and Snake lakes. The Donut installation is complete. The snake lake’s system should be up and running soon. A delay has been caused by supply issues of component parts from Europe.
Both systems are wind/solar powered. They will run from midnight until 8:30. They can also be turned on remotely at other times should a need arise.